Monday, March 2, 2009

The Village by High Park, construction reaches railroad roadbed

[caption id="attachment_2972" align="aligncenter" width="500" caption="Village by the Park front, CPR Railroad second, unused flour mMills silos"]Village by the Park front, CPR Railroad second, unused Flour Mills silos[/caption]

This week the  Village by High Park construction height  will reach the railroad roadway bed height and from what we understand they will cap the concrete built so far, with a concrete "roof" - which will be the ground level floor deck.  This will  allow continued work on the sub levels in a manner that can he heated  for the curing of the deepest level decks .

[caption id="attachment_2973" align="aligncenter" width="500" caption="Building 1 lowest level under construction"]Building 1 lowest level undercontsruction[/caption]

[caption id="attachment_2974" align="aligncenter" width="500" caption="Concrete form closeup"]Concrete from closeup[/caption]

No comments:

Post a Comment