Showing posts with label Options for Homes. Show all posts
Showing posts with label Options for Homes. Show all posts

Monday, August 15, 2011

Monarch Rd and Heinzman Place



 



 

A view of Heinzman Place the remaining Maple Leaf Silo and the last of the Monarch Rd. pavement . Monarch Rd which is now all but gone used tothe main address for the  milling firm that it received its name from, at the end of the roadd facing south to your was the repairs shop of the milling operations and to your left was DOMINION CORRUGATED PAPER.

 

 

Campbell Flour Mills Co.Ltd. 12 Monarch Rd.
Maple Leaf Milling Co.Ltd. (Monarch brand flour

 

Thursday, February 25, 2010

The Village by High Park, the electrical rooms - photo post

Well this is just as exciting to this author as all the other photos from the blogs tour of the Village by High Park development.  In the photos below you are inside the election control and distribution rooms. These rooms are placed at the north west corner of the development at the south east corner of the Keele St underpass (subway).

[caption id="attachment_6082" align="aligncenter" width="500" caption="Two cases to the right (at rear) are Toronto Hydro control switches"]Two cases to the right (at rear) are Toronto Hydro control switches[/caption]

[caption id="attachment_6083" align="aligncenter" width="281" caption="inside one of the step-down transformers"]inside one of the step-down transformers[/caption]

[caption id="attachment_6084" align="aligncenter" width="500" caption="Distribution to units area"]Distribution to units area[/caption]

[caption id="attachment_6085" align="aligncenter" width="281" caption="Individual control switches"]Individual  control switches[/caption]

The Village by High Park, Retail what if?

[caption id="attachment_6078" align="aligncenter" width="473" caption="Looking out of the/one of the retail spaces in the building"]Looking out of the/one of the retail spaces in the building[/caption]

It's  the most obvious location for what type of  retail operation? -  a restaurant, a clothes cleaner, a convenience store, a flower store, a dollar store, a hobby store or art store.  But someone or some corporate entity probably is  planning on making a go the ground-floor space at the The Village by High Park, aka the old Canadian Tire Keele St site. what will/should it be?

As you may know, this tower is a condominium hybrid mix of affordable units and some retail  built by Deltera Construction for the Options for Homes company. For the moment the space is undivided to offer flexibility with the leasing opportunities.

Is this where the chains stores such as Starbucks will place themselves in the Junction?

Below is an image of a similar type and size retail operation at the bottom of a condo development - gives you an idea of what retail along this stretch will look like.

sim store

Tuesday, February 2, 2010

The Village by High Park, putting in two sections of rebar and concrete of 1 meter thick

[caption id="attachment_5951" align="aligncenter" width="473" caption="this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side."]this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side.[/caption]

DSC00227

This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building.

Friday, January 22, 2010

The Village by High Park, water - fire and domestic use

In todays Village by High Park video  Sean McCaffrey the senior site superintendent for Deltera  provide a audiovisual tour of the mechanical systems for domestic and fire water use.

Next week more about the storm water collection and the design plan for the 100 year strom factor.

httpv://www.youtube.com/watch?v=o5rfkQZpGA0

...oh and a new view image

[caption id="attachment_5893" align="aligncenter" width="500" caption="Looking west"]Looking west[/caption]

[caption id="attachment_5894" align="aligncenter" width="500" caption="A exciting new view of Keele St and the subway train overpass from the TOP! yes from the TOP! of the subway"]A exciting new view of eele St and the subway train overpass from the TOP!  yes from the TOP![/caption]

Tuesday, January 19, 2010

The Village by High Park, Options for Homes, and Deltera a most winning combination for the community

Building development that recognizes and grows a community is a great goal and often is missed. Not with  The Village by High Park development being constructed On Keele St just north of Dundas St. West. partnership of the Options for Homes corporation and the builder Deltera. Through the study of  the communities past built  history and current needs of the prospective buyers  they have designed and are constructing a building which will not only serve the people who will live in the a building but one that with attend to the community though a integrated visual appeal. During  the blogs tour of the construction site last week I was stuck by the partnerships adept understanding,  reworking and adaption of historical elements of local buildings there cut lines and brick facades with the addition of new methods of design and construction. The partnership is creating a new building greatly suited to the community both past and present.

All of this corporate effort is greatly enhanced and in this authors opinion , handsomely aided and made manifest by the choice a senior site superintendent with deep historical connections to the area. Deltera's senior site superintendent Sean McCaffrey is a direct descendant of Samuel Nordheimer the owner of the Nordheimer Piano factory pictured below.

Unfortunately, the Samuel Nordheimer Piano factory building no longer exists in the Junction. (2nd image below) Yet  what a great visual image it gave to the community and would still have added had it survived.  We no longer have many of buildings and businesses built by the visionary industrialists that made the Junction great during it's manufacturing origin.

Mr McCaffrey who invited the blog to tour the site gave a great amount of useful and interesting information and insights about the project which we will in the coming flow of posts about the project communicate to you. Also he has taken interest and understands how important this 1st major addition to the Junction community in many years will help redefine the community. All be... I felt the same feeling of visionary development and thoughtful effort in him that his forbearer Samuel Nordheimer must  applied to his work in the Junction.

As regular readers of the blog will remember, the blog followed closely Mr McCaffrey, Deltera and their team of masons as they historicity rebuild the return wall of the CPR subway Bridge this past summer. That is just one example of the thought and commitment being put forward on the project more will follow in the coming posts.

Below is  our 1st series of images related to the text above  and below these images the blogs 1st images of the inside of the site  - hope they excite all of you as much as they did this author.

Tomorrow audio and images related the environment efforts of the development and image essay on the flow of construction.

[caption id="attachment_5852" align="aligncenter" width="500" caption="Map of the above image - One of the Nordheimer Nordheimer ">familly business ledgers (upper left cover only) The Samuel Nordheimer familly home (just outside the Junction) (lower left)The Samuel Nordheimer Piano factory building (upper right)"]DSC00371[/caption]

[caption id="attachment_5853" align="aligncenter" width="281" caption="The Samuel Nordheimer Piano factory building WOW!"]DSC00369[/caption]

[caption id="attachment_5854" align="aligncenter" width="500" caption="Railside wall designed to deflect trains from building, this wall has no concrete connection to the main condo building to further isolate vibration of the rail tracks from the building"]Railside wall designed to deflect trains from building, this wall has no concrete connection to the main condo building to further isolate vibration of the railtracks from the building[/caption]

[caption id="attachment_5855" align="aligncenter" width="500" caption="electrical systems and plumbing systems go in before the floor slab is poured, One floor (slab and walls per week  is the production timing.)"]Elecrtical systems and plumbing systems go in before the floor slab is poured, One floor  (slab and walls is the production timing.[/caption]

[caption id="attachment_5856" align="aligncenter" width="500" caption="From the current working level looking at the grain silos"]From the current working level looking at the grain silos[/caption]

[caption id="attachment_5857" align="aligncenter" width="500" caption="INSIDE! the view down one the hallways in the buildings - note the fine working of the poured concrete"]INSIDE the view down one the hallways in the buildings - note the fine working of the poured concrete[/caption]

[caption id="attachment_5858" align="aligncenter" width="500" caption="The view of one the common balcony areas - other areas have private balconies while others have sliding doors which open for a view and open the unit to the outside air"]The view of one the common balconey areas - other areas have private balconeies while others have sliding doors which open for a view and open the unit to the outside air[/caption]

[caption id="attachment_5859" align="aligncenter" width="500" caption="The move in and out elevator which also servers as a normal passage elevator when not in service for a move. It is also the fire services elevator. more on this in a later post. Directly across from this elevator are the normal passenger elevators"]The move in and out  elevator which also servers as a normal passage elevatore when not in service for a move.  It is also the fire services elevator. more on this in a later post. Also directly accross from this elvator are the normal passinger elevators[/caption]

Tuesday, January 12, 2010

The Village by High Park, have questions?

[caption id="attachment_5798" align="aligncenter" width="490" caption="Our 1st night image of the upcoming Village by the Park building"]Our 1st night image of the upcoming Village by the Park building[/caption]

If you have a question that particularly interests you about the construction of  The Village by High Park on Keele St just North of Dundas St West please send it to the blog in the next day or two.

Why? ..because Deltera Construction has very kindly offered the blog a photo and question answer question.  send or comment them and we will ask them when we attend.

what is the blog hoping for right off  in photos...

1) a internal shot the rail tie back wall.

2) A never before shot the Keele st Dundas west intersection from the building - just above the rail subway [1.  an underground tunnel or passage enabling pedestrians to cross a road or railway, such as the one just north of Vine ave on Keele st -  footnote of meaning suggested by blog reader ]  level

and choice of photo op?

... lucky for us and kind of them.

Please mail (thejunctioneer@gmail.com) or place your questions is a comment

Tuesday, November 3, 2009

The Village by High Park, shows it's street presence

DSC05091

The options for homes condo building closest to Keele St. is  showing what the new buildings shear scale will mean to the stretch of Keele St. directly in front of the development.

No real setback from the street appears to be present that will allow for stop and talk on the Keele St. side, which could be a good thing as Keele St. in this area is really becoming a pass through arterial road in a big way. Hopefully the new east - west alignments of the  two new building fronts will  result in a new role for "hill road" that existed on the site for so long. If new retail at the base of the building is put in it could help bring the area directly into the community.

Tuesday, May 19, 2009

The Village by High Park, construction view from Monarch Rd.

vbhp-view-from-monarch-rd


vbhp-view-from-monarch-rd-closeup


View of the construction process of The Village by High Park, Options for Homes, development just north of Keele St. And Dundas St West. In the smaller image above you can see the large wall designed to defect trains as the blog was told by site workers. This view is from the end of Monarch Rd., a roadway which is quietly disappearing as the railroads encrouch on it.

Friday, April 3, 2009

The Village by High Park, second contruction crane appears

[caption id="attachment_3274" align="aligncenter" width="471" caption="Second crane as viewed from Junction Rd."]second crane as viewed from Junction Rd.[/caption]

 

 

The Village by High Park condominium project is quickly getting both building units up and out of the ground.  While the 1st building  started has now crept past the height of the rail tracks, the foundation excavation for the second  is underway.

Monday, February 2, 2009

The Village by the Park 1st concrete images

[caption id="attachment_2494" align="aligncenter" width="499" caption="1st growth concrete in structure 1"]1st growth concrete in Buidling 1[/caption]

twtwt

[caption id="attachment_2491" align="aligncenter" width="500" caption="North west corner view Sat Jan 31 2009"]North west corner view Sat Jan 31 2009[/caption]

Friday, January 30, 2009

The Village by High Park putting back some historical elements?

During past few weeks the Options for Homes development on Keele St.  just north of Dundas St. West,  has seen alot of activity, just none of it lending itself to interesting  images the told a story of progress. They have been working on the foundation area of their  1st  tower, as can be seen in the concrete form work in the 1st picture below.

[caption id="attachment_2479" align="aligncenter" width="300" caption="Foundation forms"]Foundation forms[/caption]

 

 

But the real great and interesting item of note and the reason for this post today is that they appear to be replacing some of the stone they removed from the historic wall that ran along the side their lot on Keele St.  In the picture they may be  returning the wall into their lot, that is -  where the original wall ran along Keele St., they are replacing a section at a right angle for maybe 20 feet.

[caption id="attachment_2480" align="aligncenter" width="500" caption="New wall from old?"]New wall from old?[/caption]

Many of the removed rocks sat in their lot for for some time this may be the reason.

[caption id="attachment_2477" align="aligncenter" width="496" caption="Cutting Stone"]Cutting Stone[/caption]

Will return later today to try and figure it out

Wednesday, January 21, 2009

The Village by High Park tower crane from Hook Ave.

[caption id="attachment_2351" align="alignright" width="300" caption="The Village by High Park crane with building mass outlined in yellow"]The Village by High Park crane with building mass outylined in yellow[/caption]

The view along Hook Ave, will change greatly with the addition of the now being consrtucted Village by High Park 1st building.

In the image to the right is drawn in a yellow rectangle of approximate scale  to the new building.

People  buying units in this building on the east face will have some great views towards the central city.

Sunday, January 18, 2009

403 Keele Steet - Village by High Park – Project update

403 Keele Steet - Village by High Park artsist renderings
   Tower A (Phase 2)                           Tower B (Phase 1) 
403 Keele Steet - Village by High Park artsist renderings

 

 

Village by High Park is a high rise condominium development consisting of one 16 storey 296 unit condo and one 23 storey 311 unit.  Commercial retailspace will also be provided at ground level.

 Project update

·       September 2008 – Demolition was completed on the old Canadian Tire store

·       October 2008 – Shoring work to hold back the CP rail lines in progress

·       December 2008 – Continued on site preparation

·       January 2009 – Crane installed to begin Tower B (16 storey 296 unit)

 Looking forward

·       Spring 2009 - Crane is installed to begin Tower A (23 storey 311 unit)

·       Early Winter 2009 – Tower A and B external structure complete

·       Winter 2010 - Internal work to compete suites, amenities and HVAC

·       Spring/Summer 2010 – Occupancy begins!

 

Options for Homes is also hoping to hold a community celebration this spring

Submitted by Matrin L.

Monday, December 1, 2008

The Village by High Park, Site prep for foundation - photo update


Photo Microsoft Live maps

The site this past summer.



They continue to introduce I beams into the ground to provide structure for a bearing wall which will hold back the surrounding earth when they dig the ground out for the foundation. To do this they took down more of the subway wall, hopefully they will not need to take down any more.



This machine was used quite a lot at the railroad side of the lot, it will be interesting to see how it's used (if at all) on the Keele St side and the Gas station side of the lot.



for those who would like a current view of the progress.

posted by Robert

all photos taken by Lado Soudek (he is a professional photographer, that's why his photos are so much better than mine - Robert

Typing "tiebacks" into the search box on this blog will bring up all the posts within this project that have to do with the ground prep work.

Monday, November 17, 2008

The Village by High Park, ...not to bore anyone

But this another post about shoring and tiebacks...



Old Cantire store shoring that they are keeping?


But this is really exciting -  Deltera, really their subcontractor, is still working on the railway line shoring wall. This wall which will and has to be designed and built to hold back the railway tracks is so Junction. It abuts the original railway subway, it holds the railway together much as the old Cantire Store foundation did and still does in parts, and will be an important part of the new condo building.



If you click in the cloud tag on The Village by High Park text you can view posts with images following the process they used to… 1st remove and level the soil hill mass that was against the wall and the old building in areas, then strengthen the ground with new temporary rock fill…then drill  & place in the steel ibeam shoring, then remove the soil mass until they had a shear wall.





Completely new! shoring closer to Keele St




This guy is on the tracks without a CPR escort, he's is trouble





Posted by Robert

Wednesday, November 5, 2008

Tieback work at The Village by High Park



The site really is all about tiebacks now, some earth moving, and there has been a inclined drilling machine on site for a number of days which seems to be working on tiebacks for the railroad wall. Of course, the required CPR watcher is in attendance.


Info on Tiebacks from wikipedia [opens in new window]



Because the fun is really visual at this time we asked a local professional photographer  to get some great tieback work shots.

Wednesday, October 29, 2008

The Village by High Park, really busy past few days at site


The site has been particularly busy, with a lot of work going on about the area of the retaining wall with vertical ibeams being driven into the ground and a whole lot of grey rock being placed in the area about 1o meters from the track side of the lot.

Thursday, October 23, 2008

The Village by High Park


The project moves on with the further inserting of piles into the ground and the removal of the last sections of the foundation. As the work is watched, an interesting question is, will they dig the lot out to a normal foundation level right to Keele St. and to the tracks, which may necessitate the complete removal of the old subway wall.





Village by High Park demo contractor truck dirt and concrete from the site up Black Creek Blvd.

Posted by Robert

Each and every day multiple hours I miss Matt and Nate

 He’s really does not answer my questions about Matt and Nate, No way, they know the truth