Tuesday, February 2, 2010

The Village by High Park, putting in two sections of rebar and concrete of 1 meter thick

[caption id="attachment_5951" align="aligncenter" width="473" caption="this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side."]this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side.[/caption]

DSC00227

This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building.

No comments: