Subscribe to:
Post Comments (Atom)
-
Serpent Mound Brochure download Comments on this post are disabled as it was getting rough, I understand people are passionate, yet can we ...
-
The Handyman Shop is sold! This great looking building located on the corner of Dundas and Quebec is a favourite for many people in the Jun...
-
[caption id="attachment_6078" align="aligncenter" width="473" caption="Looking out of the/one of the reta...
Installing solar panels for street lighting seems like a very wise capital project for a BIA to embark upon. I have doubts about the ability of the Junction BIA to come together and actually do something as bold as that without tearing themselves apart in the process.
ReplyDeleteI've seen these, and they are a great idea. I believe they might be powering the city's parking meters as well in some parts.
ReplyDeleteIs this a Bloor West BIA project or a city project? Who funded it? Any details available?
ReplyDeleteAnswering my own question - it was a 2006 joint project with the cost of less than $300,00 split between the city and the BIA.
ReplyDeleteI have similar doubts about a BIA which can't even manage to have a website with their address on it. Right now it still has the months old CONTACT Festival promo....
ReplyDeletewas told it was a Bloor West BIA, but it could and probably had the 50/50 cost ratio the city uses with BIA's for projects such as this
ReplyDelete