Tuesday, August 17, 2010

It's here

The Village by High Park condominium project is entering it's final stages with the bridling of the second building.

All the while the interior finishes are being installed in both buildings.

In the opinion of this author the buildings have gone up with almost no discernible load on the community other than what could be expected minimally from a project of this size.




-





Posted using BlogPress from my iPhone

12 comments:

  1. "In the opinion of this author the buildings have gone up with almost no discernible load on the community "

    Can you explain what exactly you mean by this comment?

    ReplyDelete
  2. One 'load' has been issues with parking on surrounding streets. The workers tend to use up all the street and lot spaces in the streets around the building but besides that not any problems.

    ReplyDelete
  3. What will happen to the load on the community after thousands of people move in to the crammed little intersection that is Keele/Dundas?

    ReplyDelete
  4. Any word on the final choice for a name?

    ReplyDelete
  5. Yes this needs to be addressed and as thectraffic study forvthecprojects was done years agomi,s good another one is being done now

    ReplyDelete
  6. Any word on what stores are moving into the ground floor on Keele?

    ReplyDelete
  7. Fantastic choice!

    ReplyDelete
  8. Zoot's Suits, Daisy's Flower Shop, and a Kwik-E-Mart

    ReplyDelete
  9. Too late to address it. The damage is done. There is only one way through the area, Dundas and Keele. Traffic has been getting worse ever since Old Weston Road bridge was demolished. Should have included a road underpass of the railway diamond along with the present GO train project. Actually, it may not be too late. The underpass is designed four tracks and really only two will be needed with the demise of that ridiculous Airport Train.

    ReplyDelete
  10. sometime next year I think

    ReplyDelete