Tuesday, April 23, 2019

2019 High Park play area changes



Colourized city map showing High Park area and site location of major play and landscape changes.

Changes to take place.

...

Cast-in-place concrete playground and sandbox border  Concrete playground ramp  Rubber playground ramp  Rubber safety surfacing  Engineered wood fibre safety surfacing and wear mats  Sub-surface drainage system c/w drywell, overflow and stone spillway/ splash pad  Sandbox  Playground equipment  Site furnishings (includes benches, patio tables, and umbrellas)  Concrete seat walls (integral beige concrete)  Decorative Boulders  Upright log border  Horizontal log border  Wading pool concrete tank and apron repairs  Replace center turret with new concrete fill wall  New wading pool drains and associated site servicing  Wading pool chamber upgrades (includes mechanical works, and new lids)  ‘Unstructured Playground Area' materials (includes placement of decorative and memorial boulders supplied and delivered by others; stumps, branches, birch logs; plastic tubing, elbows and eaves troughs; wooden planks, blocks, boxes and saw horses)  Sod restoration

No comments:

Post a Comment