Showing posts with label Heintzman Place. Show all posts
Showing posts with label Heintzman Place. Show all posts

Sunday, December 11, 2011

Mulock Ave view to Heintzman Place Condos

Heintzman Ave via Heintzman Place and Mulock Ave. connected by a sight line. This view  from outside the SE corner of the old paint plant looking down SW on Mulock Ave. over the old lands of the Maple Leaf Mills.

20111212-090852.jpg

Monday, October 10, 2011

WTJHS meeting Historical Walking Tour: Sunday, October 23 2:00 to 4:00 p.m.

 



and

Historical Walking Tour: Sunday, October 23 2:00 to 4:00 p.m.
Tickling the Keys: the Heintzman Piano Company. One of the world’s most famous piano manufacturers was based in the Junction. Follow in the footsteps of the Heintzman family and company employees during this two-hour guided walking tour led by members of the West Toronto Junction Historical Society.
Starts at Annette Street Public Library at 2:00 p.m.Tickets $20.
For Heintzman tour tickets, call 416-763-3161or e-mail: junctionhistorical@gmail.com
Tickets are also available from:
Annette Street Public Library, 145 Annette Street
Ice Cream Junction, 3103 Dundas Street West
Pandemonium, 2862 Dundas Street West
Wise Daughters Craft Market, 3079B Dundas Street West

Monday, August 15, 2011

Monarch Rd and Heinzman Place



 



 

A view of Heinzman Place the remaining Maple Leaf Silo and the last of the Monarch Rd. pavement . Monarch Rd which is now all but gone used tothe main address for the  milling firm that it received its name from, at the end of the roadd facing south to your was the repairs shop of the milling operations and to your left was DOMINION CORRUGATED PAPER.

 

 

Campbell Flour Mills Co.Ltd. 12 Monarch Rd.
Maple Leaf Milling Co.Ltd. (Monarch brand flour

 

Wednesday, July 27, 2011

Major building changes to your Junction Area house?

[caption id="attachment_8361" align="aligncenter" width="475" caption="Soil engineer checking soil conditions at a Junction area house"][/caption]

 

Increasingly many house owners in the Junction area are deciding to enlarge their house, by heightening the basement by lowing the level of the basement floor or converting the attic to usable space or adding an addition.

Any of these projects involves the use of a building permit. In addition to the architectural or designers drawings, an engineers report as to the suitability of the building foundation to support the changes will be required.

Having the knowledge about the need for the engineers report is what this post is about as in new parts of this ward the construction includes footings, but they are not common on 1st lot construction homes in the Junction. Thus the necessarily need for this professional action to performed before a permit is issued by the city.

Often the house owner finds out about this need and its  costs for the report and many times remedial foundation work to strength the foundation is required.

Most Junction houses do not have a footing, but a foundation sitting  on soil, often this has to provided to add an addition or do other major renos. This remedial work can outstrip the cost of the design services.

 

Each and every day multiple hours I miss Matt and Nate

 He’s really does not answer my questions about Matt and Nate, No way, they know the truth