Showing posts with label Old Weston Road. Show all posts
Showing posts with label Old Weston Road. Show all posts

Friday, July 22, 2011

Old communication box at St Clair Ave West and Weston Rd remains despite all the construction activity.

 

In the north east corner of of the Delta Bingo lot at St Clair Ave West and Weston Rd there remains a old communication box that has gone through many uses in the past decades.

All around it for the past few years the st Clair expansion construction has buffeted it with piles of old large water pipes and concrete debris, yet it still remains. Although the door has been pulled off since early November of 2010.



images of the box and its neighbours...





Wednesday, January 6, 2010

11 DIVISION Police Move photo update

DSC00041

[caption id="attachment_5735" align="aligncenter" width="491" caption="at the rear of the school the 1st outside of the teardown appear"]carlton ps takedown[/caption]



When we last checked in on this school near the corner of Davenport Rd and Old Weston Rd the demo work, was only beginning to start with surveying being done.

Now it's looking like the finish line for the school  is in sight, though it doesn't seem as though the big machines will be arriving in the next month if Priestly Demolition Inc follows it;s normal timeline  of removing the building inter 1st of salvageable materials . As we noted a year ago, the school is being  demolished to make way for the development of the new police 11 division station.

Friday, June 26, 2009

St. Clair Avenue West Transit Improvement Project current water works activity

st-clair-water-june-25-09-3

scte-old-water-main-valves-june-9-2009-0661

Water improvement and movement of pipes associated with the St. Clair Avenue West Transit Improvement Project , at the interesection of Old Weston Rd. and St Clair Ave, is nearing it's end. The new value is  installed, and the old value pictured above was removed about 3 weeks ago and laid at the back of the bingo hall for a few days, but now has gone. sign...

Wednesday, April 8, 2009

St. Clair Ave W. Transit Improvement Rails and welding equipment arrive

[caption id="attachment_3316" align="aligncenter" width="466" caption="The rail company welding truck is part of the equipment not at the North West intersection of St. Clair Ave W. and Old weston Rd."]The rail company welding truck[/caption]

We think after looking at the welding unit pictured here, the process here is going to be...

Flash Butt Welding where...

The surfaces of the workpieces are positioned end-to-end. As a rule, flash-butt welding is subdivided into preheating, flashing and upsetting. Preheating is carried out under low welding pressure. Once the welding joint is heated, flashing commences and joint surface material is burnt off, resulting in even joint surface. After arriving at preset flashing loss, upsetting commences, resulting in an irregular "fin" on the surface of the upset metal consisting of molten and oxidized material.Examples of flash-butt weldable items: rod stock, chains, rails and pipes.

[caption id="attachment_3320" align="alignright" width="300" caption="The rails to be welded"]The rails to be welded[/caption]

The welding unit

The welding unit

Tuesday, March 24, 2009

St. Clair Avenue West Transit Improvement Project current works activity

[caption id="attachment_3155" align="alignright" width="300" caption="Ford Ave looking south March-23-2009"]Ford Ave looking south March-23-2009[/caption]

Images taken March 23 2009 seem to indictae a lot of prep work going on  regarding St. Clair Avenue West, between Old Weston Road and

Gunns Road/Old Stock Yards Road – Road Alterations

...for the St. Clair Avenue West Transit Improvement Project

...from the city report (opens in new window)

a) Construction of a raised, mountable trackbed in the centre of St. Clair Avenue West, between signalized intersections, with curbs as required, for the exclusive use of public transit vehicles and emergency service vehicles, including Police, Fire, and Emergency Medical Services;

 

march-23-2009-005b) Widening portions of the pavement up to 2.8 metres, on the north and south sides of St. Clair Avenue West between Old Weston Road and Gunns Road/Old Stock Yards Road; and, widening the pavement up to 7 metres for the section on the south side of St. Clair Avenue West between Old Weston Road to just west of Old Weston Road...

 







[caption id="attachment_3158" align="alignright" width="500" caption="Horading on St Clair Ave West by the Mc Donalds onthe South West corner. "]Horading on St Clair Ave West by the Mc Donalds onthe South West corner. [/caption]

Each and every day multiple hours I miss Matt and Nate

 He’s really does not answer my questions about Matt and Nate, No way, they know the truth