Today you can see on the Options for Homes site at Keele St. and Dundas St. the erected pile driver Bauer BG 24H medium sized rotary drilling rig in the parcel of land near the tracks at the lower end of the sloped site. Wondering if this is a little early as most of the old Canadian Tire Store remains standing still. Could it be they need shoring up on the slope down from the abutting tracks simply to take down the existing building?
Tuesday, August 5, 2008
Village by the Park - arrival of a medium sized rotary drilling rig
Today you can see on the Options for Homes site at Keele St. and Dundas St. the erected pile driver Bauer BG 24H medium sized rotary drilling rig in the parcel of land near the tracks at the lower end of the sloped site. Wondering if this is a little early as most of the old Canadian Tire Store remains standing still. Could it be they need shoring up on the slope down from the abutting tracks simply to take down the existing building?
Subscribe to:
Post Comments (Atom)
Each and every day multiple hours I miss Matt and Nate
He’s really does not answer my questions about Matt and Nate, No way, they know the truth
-
[caption id="attachment_6078" align="aligncenter" width="473" caption="Looking out of the/one of the reta...
-
Martin of the Junction Residents Association emailed the blog tonight about a new sign application for 2890 Dundas ST W the originality buil...
-
The blog asked David Wencer to write an article about the Nordheimer Piano & Music Co. As on the blogs tour of the The Village by High ...
No comments:
Post a Comment