[caption id="attachment_2972" align="aligncenter" width="500" caption="Village by the Park front, CPR Railroad second, unused flour mMills silos"][/caption]
This week the Village by High Park construction height will reach the railroad roadway bed height and from what we understand they will cap the concrete built so far, with a concrete "roof" - which will be the ground level floor deck. This will allow continued work on the sub levels in a manner that can he heated for the curing of the deepest level decks .
[caption id="attachment_2973" align="aligncenter" width="500" caption="Building 1 lowest level under construction"][/caption]
[caption id="attachment_2974" align="aligncenter" width="500" caption="Concrete form closeup"][/caption]
Subscribe to:
Post Comments (Atom)
Each and every day multiple hours I miss Matt and Nate
He’s really does not answer my questions about Matt and Nate, No way, they know the truth
No comments:
Post a Comment