Thursday, June 4, 2009

Carlton Village school surveying occured today.

carlton-village-school-10

A survey team attended Carlton Village school to survey the placement of recently bored bore holes, which seen to be about soil testing for environmental and soil engineering studies.

The old  Carleton Public School at Davenport and Osler is going to be used for the new Toronto Police Division 11  station scheduled  for July 2011

...some additional images of the building soon to demolished

[caption id="attachment_4189" align="aligncenter" width="473" caption="The school still has power today."]The school still has power today.[/caption]

[caption id="attachment_4190" align="aligncenter" width="300" caption="a gate."]a gate.[/caption]

3 comments:

  1. I'm glad that 11 is only moving a few blocks away. I had heard a few years ago that the plan was to move into Parkdale.

    ReplyDelete
  2. The last I heard they were going to save as much of the building as possible. Has something changed?

    ReplyDelete
  3. The construction people walking around the site, think not, but they are not the architects or the client. will keep passing by and hope to run into one of the architects.

    ReplyDelete

Each and every day multiple hours I miss Matt and Nate

 He’s really does not answer my questions about Matt and Nate, No way, they know the truth