Well this is just as exciting to this author as all the other photos from the blogs tour of the Village by High Park development. In the photos below you are inside the election control and distribution rooms. These rooms are placed at the north west corner of the development at the south east corner of the Keele St underpass (subway).
[caption id="attachment_6082" align="aligncenter" width="500" caption="Two cases to the right (at rear) are Toronto Hydro control switches"][/caption]
[caption id="attachment_6083" align="aligncenter" width="281" caption="inside one of the step-down transformers"][/caption]
[caption id="attachment_6084" align="aligncenter" width="500" caption="Distribution to units area"][/caption]
[caption id="attachment_6085" align="aligncenter" width="281" caption="Individual control switches"][/caption]
Subscribe to:
Post Comments (Atom)
Each and every day multiple hours I miss Matt and Nate
He’s really does not answer my questions about Matt and Nate, No way, they know the truth
No comments:
Post a Comment