This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building.
Tuesday, February 2, 2010
The Village by High Park, putting in two sections of rebar and concrete of 1 meter thick
[caption id="attachment_5951" align="aligncenter" width="473" caption="this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side."]
[/caption]

This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building.
This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building.
Subscribe to:
Post Comments (Atom)
Each and every day multiple hours I miss Matt and Nate
He’s really does not answer my questions about Matt and Nate, No way, they know the truth
-
[caption id="attachment_6078" align="aligncenter" width="473" caption="Looking out of the/one of the reta...
-
Martin of the Junction Residents Association emailed the blog tonight about a new sign application for 2890 Dundas ST W the originality buil...
-
The blog asked David Wencer to write an article about the Nordheimer Piano & Music Co. As on the blogs tour of the The Village by High ...
No comments:
Post a Comment